 
Left and Right: Preparing the sled box boards.
 
Left: Cutting pegs on sled box. Right: Sanding sled box.
 
Left: Finished sled box. Right: Cutting tapers on sled ribbing.
 
Left: Sanding sled ribbing. Right: Checking sled ribbing.
 
Left: Sled base with ribbing. Right: Gluing ribbing to body of sled.
 
Left: Getting sled drag shaft ready. Right: Cutting sled drag shaft.
 
Left: Planing sled drag shaft. Right: Drilling holes through sled drag shaft.
|