Left: Drilling holes for treenails. Right: Attaching treenails to runner.

 

Left: Putting treenail in mount. Right: Carving the runners.

 

Left: Applying Danish Oil. Right: The finished sled.

Left: Builders with sled. Right: Builders pose with both sleds.

 

Left: Building shipping crate. Right: Lettering the crate.

 

  Gokstad Photos: Page 1 2 3 Main Photo Page > Home >